A purpose-built emergency operations facility in Patagonia, developed to support coordinated response and essential operations in a challenging environment.
- Status
- Under construction
- Client
- U.S. Army Corps of Engineers (USACE)
- Size
- GBA 900 m² · Site improvements 5,000+ m²
- Investment
- USD 3.5M
- Location
- Lago Puelo, Chubut, Argentina
- Project manager
- Alan Urenda
- My role
- Project Manager
Overview
Located in Argentine Patagonia, the Emergency Operations Center is an institutional infrastructure project developed for the U.S. Army Corps of Engineers (USACE). The facility is designed to support emergency response operations and provide essential services in a region characterized by challenging weather and construction conditions.
As Project Manager at Serrano Proaño, I oversee project execution, budget and contract management, scheduling, procurement coordination, and multidisciplinary teams. My role involves working directly with the client, subcontractors, and technical specialists to manage project risks, resolve challenges, and support delivery in accordance with contractual and quality requirements.
Gallery
Scroll to explore →
Project Concept
The National Firefighting Emergency Operations Center was conceived to strengthen wildfire prevention, monitoring, and emergency response capabilities in Argentina’s Patagonian-Andes region, an area surrounded by extensive forests and exposed to significant wildfire risks.
Developed for Argentina’s Ministry of Security and the National Fire Management Service (SNMF) under a USACE design-build contract, the approximately 900 m² facility brings together administrative offices, monitoring and radio communication rooms, training spaces, and operational support areas.
Beyond the building, the project includes more than 5,000 m² of exterior improvements, including parking, maneuvering areas, site circulation, and supporting infrastructure. Its integrated systems include HVAC, radiant floor heating, communications, backup power, water storage, and wastewater treatment.
Designed to respond to Patagonia’s demanding climate and remote location, the facility combines functional architecture and resilient infrastructure to support the teams responsible for protecting communities and natural environments from wildfires.
My Role & Contributions
- 01
Project Leadership
Lead multidisciplinary teams across construction management, QA/QC, HSE, procurement, and contract administration, aligning technical, commercial, and delivery objectives.
- 02
Budget & Cost Control
Manage the USD 3.5M project CAPEX, overseeing budgeting, cash flow, cost control, payment applications, and financial performance throughout construction.
- 03
Planning & Scheduling
Manage the project schedule using Primavera P6, monitoring contractual milestones, construction progress, and schedule deviations while implementing recovery strategies.
- 04
Contract & Procurement Management
Oversee subcontractor management, procurement strategies, commercial evaluations, and contract administration, coordinating specialized work packages and supplier agreements.
- 05
Client & Stakeholder Coordination
Serve as the primary interface with USACE, local authorities, consultants, contractors, and suppliers, ensuring effective communication and alignment with contractual requirements.
- 06
Quality, Safety & Technical Coordination
Coordinate architectural, structural, and MEP interfaces alongside QA/QC and HSE teams, managing technical risks, design changes, and compliance with project standards.
Challenges & Outcomes
- 01
Remote Location & Specialized Workforce
The project’s remote Patagonian location made sourcing qualified contractors and specialized suppliers challenging. I adapted procurement and contracting strategies to secure resources while maintaining technical and quality requirements.
- 02
USACE Procedures & Project Controls
USACE’s structured documentation and approval processes required rigorous coordination of technical submittals, schedules, and quality documentation. I managed these interfaces to support contractual compliance and construction execution.
- 03
Multicultural Team Coordination
Coordinating professionals and stakeholders from Argentina, Ecuador, and Peru required aligning different working practices and communication approaches. I established a common project management and reporting framework to improve coordination across teams.
- 04
Contractor Transition & Project Recovery
Following the departure of the main construction contractor, I reorganized the remaining scope into specialized work packages, coordinated the procurement of replacement contractors, and implemented recovery actions to maintain construction continuity.